64 axle lines SPMT system

64 axle lines SPMT system

64 axle lines SPMT system to load steel tube length 93m, mass 1700t to the boarding vessel

Compare with the wind power plant on land, the standing tube of the wind power plant in the sea is much longer and heavier. It is amazing that customer has 64 axle lines SPMT system to load steel tube length 93m, mass 1700t to the boarding vessel.

64 axle lines SPMT system

64 axle lines SPMT system

64 axle lines SPMT system

Recommended